Global Food

Power division

Who are we?

We are a member of Al Batha Engineering group and part of GECO Mechanical and Electrical Ltd, Sharjah.

Where are we?

We are situated in GECO Complex in Sharjah industrial Road 12.

What we do?

GECO Power division is exclusively carrying out the all power related works in all over emirates. We are capable of carrying out the HV, MV and LV substations, cable laying and Transmission and Distribution networks on Turnkey basis.

We have vast experience in the field of electrical Power Works. We are in the market since 1979. Our first milestone achieved was development of Distribution network for Um Al Quiwan in 1982 for one of our prestigious client Ministry of Electricity and Water ( now Federal Electricity and Water Authority), with contract value of worth AED 45 million.

Since establishment, GECO PD has a substantial growth in the power field to bag and execute various valuable orders to our prestigious clients.

What is our capability?

We are capable of carrying out the turnkey projects in Power Generation, Transmission and Distribution works. We have our own well trained engineers and technicians to carry out the works.

Why we?

Our key personals are well motivated, specialized, trained and experienced team of engineers, who are all fully aware of local regulation and requirements, to execute the works, to greatest satisfaction for the Investors/owners/End-user.

  • With minimum hassle
  • With utmost safety
  • Within stipulated time frame and
  • Possible Best Quality.

What is in our records?

We GECO-PD so far executed various projects successfully with greatest satisfaction to the owners, in time. Some of the extracts are listed below:

  • Development of entire network in Emirate of UAQ dated back in 1980.
  • Old UAQ Central control centre(SCADA)
  • Development of Emirates industrial City – 33 and 11KV network consists of 4 nos of 33KV substation, 60 Km 33 KV cable network, 100 nos of 11/0.415kV package substation alongwith interconnecting 11KV network.
  • Development of Al Tai Residential Complex – 33 and 11KV network consists of 1 no. of 33KV substation, 40 Km 33 KV cable network, 40 nos of 11/0.415kV package substation along with interconnecting 11KV network.
  • Development of Sharjah Investment Centre – 33 and 11KV network consists of 4 nos of 33KV substation, 150 nos of 11/0.415kV package substation along with interconnecting 11KV network.
  • Hamriyah Free Zone Pahse II – Extension of 132KV substation(132KV switchgear and 60/75 MVA transformer) and 2 nos of 33/11KV substation along with 60 Km of Power and 5 Km of FO network( Total on Turnkey basis)
  • Various Substation contracts of FEWA – New and Extensions.
  • FEWA 33 KV cable laying works on turnkey basis(190 kM of 33KV cable)
  • FEWA 11 KV network development(400 Km cable laying + indoor and outdoor substations)
  • 120 kM of 11KV transmission network on turnkey basis(Hex. Steel pole design)
  • Refurbishment and Revamp of 11/3.3/415 V Substations in DUBAI.
  • WASIT POWER HOUSE – Addition of 2 60MW Gas Turbine units(Turbine make = Rolls Royce) Joint consortium with M/S Rolls-Royce.
  • CMW – Al hamra Power house with 4 nos of 1MW DG sets with controllers, with synchronizing panels and integration with ADDC network.
  • Various maintenance works for CMW in Al Dhafra, Al Falah, Al HAmra bases.
© 2024 GECO - All right Reserved